Jawaharlal Nehru National Solar Mission (JNNSM)
Ministry of New & Renewable Energy
Establishing India as a global leader in solar energy through rapid deployment of solar technologies across utility-scale, rooftop, and off-grid applications.
Launch Date
January 2010
States & UTs Coverage
36
Duration
2010â2030
Activities
42
Indicators
24
Total Budget
âš86,000 Cr
Key Targets
500 GW RE by 2030
Installed Capacity
210 GW (2025)
Current Capacity
40 GW target
Rooftop Solar
50 GW in development
Solar Parks
Monitoring Mission Progress through Indicators
Last updated: Dec 2025
Showing 12 of 12 indicators
Installed off-grid solar capacity (GW)
OutputOn TrackNSM_IND003 ¡ Off-grid and Decentralised Solar Applications
Share of solar in total installed power capacity (%)
OutcomeOn TrackNSM_IND009 ¡ Solar Share in National Power Mix
Solar RPO compliance rate (%)
OutcomeAt RiskNSM_IND010 ¡ Renewable Purchase Obligation (RPO) Compliance
Solar capacity under CPSU Phase-II (MW)
OutputAt RiskNSM_IND007 ¡ CPSU Phase-II Solar Projects
Solar PV manufacturing capacity under PLI (GW)
OutputAt RiskNSM_IND008 ¡ Solar PV Manufacturing - PLI Scheme
Installed grid-connected solar capacity (GW)
OutputAt RiskNSM_IND001 ¡ Grid-connected Solar Power Development
Standalone solar agriculture pumps installed (Lakh)
OutputAt RiskNSM_IND004 ¡ PM-KUSUM - Standalone Solar Agriculture Pumps
CO2 emissions avoided through solar (Million Tonnes/yr)
ImpactAt RiskNSM_IND012 ¡ Carbon Emissions Mitigation
Rooftop solar capacity installed (GW)
OutputNeeds AttentionNSM_IND002 ¡ Grid-connected Solar Rooftop Programme
Grid-connected agriculture pumps solarised (Lakh)
OutputNeeds AttentionNSM_IND005 ¡ PM-KUSUM - Solarisation of Grid-connected Pumps
Employment generated in solar sector (Lakh jobs)
ImpactAt RiskNSM_IND011 ¡ Green Jobs Creation in Solar Sector
Decentralised ground/stilt-mounted solar capacity (GW)
OutputNeeds AttentionNSM_IND006 ¡ PM-KUSUM - Decentralised Ground-mounted Plants
About Solar Mission
Mission Overview
Establishing India as a global leader in solar energy through rapid deployment of solar technologies across utility-scale, rooftop, and off-grid applications.
Vision
To establish India as a global leader in solar energy by creating the policy conditions for solar technology diffusion across the country as quickly as possible.
Key Highlights
Installed Capacity
500 GW RE by 2030
Current Capacity
210 GW (2025)
Rooftop Solar
40 GW target
Solar Parks
50 GW in development
Key Objectives
- Deploy 100 GW grid-connected solar power by 2022 (revised to 500 GW RE by 2030)
- Reduce cost of solar power generation through long-term policy, large-scale deployment and R&D
- Achieve grid-parity of solar power with conventional power by 2030
- Create favourable conditions for solar manufacturing in India
Milestones & Achievements
Achieved 123.13 GW grid-connected solar capacity (Aug 2025) â exceeding original 100 GW target
Original target 20,000 MW revised to 100,000 MW (Jun 2015) â then achieved ahead of schedule
PM-KUSUM deployed 14 lakh standalone solar pumps de-dieselizing farm sector
48,337 MW integrated solar PV module manufacturing capacity under PLI
17 lakh direct jobs created under PM Suryaghar scheme; 38 lakh total RE jobs